Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black

Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black

$2,159.98 USD
Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black
$2,159.98 USD

About This

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions

Overview

  • Brand : Vesgantti
  • Assembly Required : Yes
  • Seat Height : 21 Inches
  • Weight Limit : 1750 Pounds
  • Product Dimensions : 108"D x 108"W x 35.5"H
  • Item Weight : 80 Pounds
  • Type : Sectional
  • Color : Corduroy - Black
  • Special Feature : Cloud Sectional, Extra-deep, Pillow Top Armrest, Removable Cover, Two Sets of Legs
  • Room Type : Bedroom, Home Theater, Living Room
  • Seating Capacity 5 : Style Modern
  • : Seating Capacity 5
  • : Style Modern
  • Shape Rectangular : Frame Material Wood
  • : Shape Rectangular
  • : Frame Material Wood

Made with care

Heirloom quality

Premium materials

Classic styling

Styled With

Vesgantti 108" V-Shaped Corner Couch Sectional, 7 Seat Customizable Modular Cloud Couches with Movable Ottoman, Corduroy Deep Seat Sofa Set with Chaise for Living Room, Bedroom and Apartment, Black

You may also like